
Before
We noticed that the lower siding would need to be pulled off to inspect/patch/caulked as needed.

Before
An example of nail pock marks/patching

Before
Noticing where the seams were patched up before and would need attention during the job

Before
These corners of the patio door was another possible place where the leaking was coming from.

In progress
Installing the EPDM rubber

In progress

In progress
Removing all the rotted plywood

After
Take a look at their new EPDM rubber roof sunporch!